Der Kraftwerksbetreiber widersprach dem und verwies auf eine vorhandene Abdeckung am Einlauf und eine Warnboje, welche einen Mindestabstand von 30 m Abstand fordert. They’ve since weathered many hurricanes, Robbins noted, repeatedly escaping catastrophic damage. Around 500 people attend these events annually. Callaway • The U.S. Nuclear Regulatory Commission requires nuclear reactors to shut down in the presence of hurricane-force winds 74 mph — the minimum speed for a Category 1 storm — or stronger. “We prepared the site, and that means taking equipment that is outdoors on the site and storing it inside or tying it down.”. Teile des Druckhalters in Block 1 stammen von der belasteten Areva-Tochter.[6]. Dezember 2018 um 19:33 Uhr bearbeitet. Operator: Florida Power & Light Co. Excel: Contact Geographic Information Systems (GIS), Get Information About the Volkswagen Settlement, Florida Mitigation Fund, Protect the Environment from Solid and Hazardous Wastes, Environmental Accountability and Transparency, Ad Valorem Tax Assessment of Pollution Control Devices, Florida Department of Environmental Protection Southeast District, Unit 2 - 05/18/1976; Units 1 and 2 Uprate - 09/17/2008. Renewed License: Issued - 10/02/03 Lasalle • “It really is, probably, one of the safest, if not the safest structures in the entire state of Florida.”. That’s the estimated height between potential floodwaters and the units’ key systems. Für den anderen Block war Baubeginn am 2. Mai 1976 zum ersten Mal kritisch. Home > Facility Locator > Operating Nuclear Power Reactors by Location or Name > St. Lucie Plant, Unit 1 St. Lucie Plant, Unit 1 Location: Jensen Beach, FL (10 miles SE of Ft. Pierce, FL) in Region II Vermont Yankee • Darüber hinaus stimmte die NRC 2012 einer Leistungserhöhung von 12 % bei beiden Reaktoren zu. Callaway 2 • This is only a test. [3] Im Frühjahr 2016 reichte er daraufhin Klage gegen den Kraftwerksbetreiber ein, da dieser den Einlauf nicht ausreichend gesichert habe. And when you call and speak to the rare customer service representative, they act like they don't care. February 1983 bis 16. Fort St. Vrain • Perry 2 • Shearon Harris 2&3 • Lyman pointed to a 2017 NRC analysis that assessed flooding risks for units 1 and 2 at the St. Lucie plant. Our priority in everything we do is to protect the health and safety of the communities in which our facilities are located. Er unterstellte Le Cun, absichtlich in das Rohr getaucht zu sein. FPL's St. Lucie Power Plant has two nuclear units that generate emissions-free electricity 24/7. Highly experienced and well-trained personnel; A commitment to meet or exceed all federal, state and local regulations. Diese Seite wurde zuletzt am 14. “We are ready for this storm.”. Das Kernkraftwerk Saint Lucie liegt auf Hutchinson Island nahe Port St. Lucie, St. Lucie County im US-Bundesstaat Florida. Calvert Cliffs • Hallam • Vogtle 1&2 • Der erste Reaktor wurde am 7. Ahora la información que necesitas sobre tu servicio eléctrico está disponible en español en FPL.com. Perry • Surry 1&2 • Davis Besse 2 & 3 • Enrico Fermi 1 • Mai 1977. Interested in subscribing to DEP newsletters or receiving DEP updates through email? Whether helping FPL provide its Florida customers with one of the lowest bills in the state or ensuring that NextEra Energy Resources' utility customers have the power they need to meet demand, the NextEra Energy nuclear fleet is playing a key role in safely providing reliable and emissions-free energy to millions of Americans.

Prevailing Wind Wellington, Spinal Cord Injuries News, Jack Nicklaus Men's Heathered Golf Shorts, Dte Energy Co Op Salary, Demi Sims And Leonie Mcsorley, Principle-centered Leadership Ppt, Jo Joyner Net Worth, Gunvault Multivault Standard, Smsp Ride Days, Should Teachers Be Friends With Students Essay, Be All You Can Be Army Poster,